1: ALH truck(s) arrive.
|
2: Trucks are unloaded by our crew and equipment and items accounted for.
|
3: Stack and level logs.
|
4: All dovetail corners caulked.
|
5: All dovetail corners are spiked.
|
6: Alignment rods are installed per design.
|
7: Logs are topped out.
|
8: Log walls erected.
|
9: Ceiling beams set.
|
10: Ceiling beams set.
|
11: Wiring installed at preplanned locations (by your electrician) and ceiling deck installed.
|
12: Shed dormer walls are built.
|
13: Rafters set.
|
14: Double ridge beam for wide spans.
|
15: Corners are stacked tight.
|
16: Symmetry designed into system to afford aesthetic beauty.
|
17: Sub-jambs are set for windows and doors.
|
18: Sub-jambs are cut short to allow for minimal settlement.
|
19: Shed dormer wall erected.
|
20: Dog house dormers framed.
|
21: Collar ties placed.
|
22: Collar ties bolted.
|
23: Roof deck installed.
|
24: Insulation panels applied over builders paper.
|
25: Builders paper applied for temporary roof dry-in.
|
26: Front window dormer framed.
|
27: Begin 1 inch log veneer with true dovetail corners at garage.
|